Firefly No.776

Firefly No.776 Here you can find information and the latest news on how the restoration of Andrew Barclay locomotive number 776 - Firefly is progressing.

Have you ever wondered what all the parts on Firefly do? Here’s a handy guide thanks to Bon Accord Locomotive Society.
30/03/2020

Have you ever wondered what all the parts on Firefly do? Here’s a handy guide thanks to Bon Accord Locomotive Society.

Machining work has re-started on the axle box brasses along with cleaning of the frames.
19/03/2020

Machining work has re-started on the axle box brasses along with cleaning of the frames.

The big job for today was removing the saddle casting for replacement. We’ve also freed up the brake beam and the liftin...
17/03/2020

The big job for today was removing the saddle casting for replacement. We’ve also freed up the brake beam and the lifting link shaft.

Frames are starting to change colour. Photo B Faulkner
03/03/2020

Frames are starting to change colour. Photo B Faulkner

Busy day yesterday. The front of the barrel finally came off with a little persuasion. The curved plate to replace the f...
19/02/2020

Busy day yesterday. The front of the barrel finally came off with a little persuasion. The curved plate to replace the front frame stretcher/smokebox saddle has been delivered. We’ve also made a start on removing the drivers side cylinder. Huge thanks to Dave Horsley and Mick Hooper for their help.

Busy day today. All the rivets have been removed so the front part of the barrel can be taken off to be renewed, and rea...
15/02/2020

Busy day today. All the rivets have been removed so the front part of the barrel can be taken off to be renewed, and ready for the boiler inspector. We’ve also moved the frames under the crane in the shed ready to take out the damaged casting.

08/10/2019
26/09/2019

The N-LR has created a poster/leaflet of the major projects that it would like to undertake to develop the line.... Please share, donate via https://www.goldengiving.com/wall/northampton-and-lamport-railway or join us on the journey by becoming a member or even better a Volunteer Working Member.... see https://www.nlr.org.uk/the-volunteers-at-the-nlr-need-you/ for more details
Thanks is given to Volunteer Working Members Tom Allen & David Millard for their work on this poster/leaflet.

Another couple of jobs done today. Rest of the rivet heads removed and the throat plate cleaned up and painted.
22/08/2019

Another couple of jobs done today. Rest of the rivet heads removed and the throat plate cleaned up and painted.

Address

Northampton
NN68BA

Website

Alerts

Be the first to know and let us send you an email when Firefly No.776 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category