27/08/2026
Hi everyone,
I thought it was about time that I began telling the history of the line (on this occasion, the physical line), which was started back in April 2022, and identified as “Phase 1” (I know, very imaginative 😆).
Firstly, whilst the garden was lovely, it wasn’t really suitable for our needs and therefore a lot of work was required to take us back to a “blank canvas”, where we could make it our own.
Straight off the bat was a lot of veg clearance so off track were employed to clear all this out, this was then followed by some fairly heavy civils works including new fencing, a new trellis and frame and a few other bits and bobs.
However, soon after this was done, the Earl’s father was consulted as a former colliery surveyor, to assist in the surveying of the land and determine the art of the possible with respect to the railway and its levels.
Shortly after, some materials were obtained to construct the first timber framed raised sections of the railway. As you can see in the pictures these were created from 2.4m long sections of 6x1 board, on top of 2x2 cross bracing, with 3x1 edging boards, all of this was of course treated timber but was given a liberal coating of preserve and then felted. These were then fixed to a pair of 4x4 posts concreted in the ground. (Later these top boards were lifted off to install another post mid span to reduce sagging as the bending moment had been too great for the timber to resist).
At this point the first items of rolling stock and track were placed on the boards to confirm track separation prior to the creation of the first curved segment, which would complete “Phase 1”.