11/10/2026
Not your everyday engine changeout!
The boys recently completed an engine replacement in a remote location with limited access making the removal and installation a little more involved than usual.
With the engine tucked away in a tight space the job required some careful planning and a series of controlled lifts. Our team had to identify suitable lifting points and daisy-chain the engine through multiple confined areas including doorways and up through the steering room hatch.
From there a wharf crane was used to lift the old engine out and lower the replacement into position before working through the same process in reverse.
A challenging job with plenty of moving parts but a great example of the experience, teamwork and problem-solving that goes into marine mechanical work.
Another good effort from the SMD crew getting it done in a location where access was anything but straightforward.