20/05/2026
🙌Proud to have our custom innovation trailer out on the road doing what it was built for!
The wind turbine components are now rolling from the Port of Newcastle to Uungula Wind Farm, with oversize loads moving more than 400km across regional NSW.
Built with The Drake Group to suit these massive tower sections, the 5×8 Swingwide is helping keep everything low, steady, and moving safely from port to site.
Big loads, big distances, and it’s only just getting started.