Petroczi National Rail Services

Petroczi National Rail Services Three generations. 131+ years of combined railroad experience.

People-first, safety-driven industrial rail infrastructure and turnout expertise, delivering correct geometry and zero shortcuts for Canadian Class 1 railroads. - General and Sub-Contracting
- Rail Consulting
- Rail Yard Construction
- Industrial Track Inspections
- Industrial Track Welding
- Preventative Track Maintence
- Switch Maintenace & Adjustments
- Industrial Development Engineering
- Tear Outs or Revializations
- Rail Materials and Logistics

Rail defects rarely appear overnight.This rail end presents with an advanced rail end batter that has progressed into a ...
02/08/2026

Rail defects rarely appear overnight.

This rail end presents with an advanced rail end batter that has progressed into a Vertical Split Head (VSH).

While not considered an in-service rail failure, the defect is beyond practical repair. Welding is no longer a viable option, and the rail requires close, routine monitoring until it can be safely replaced.

This is why early identification and timely intervention matter — rail degrades predictably over time, and small defects become costly when left unaddressed.

This project in Quebec was a big milestone for us.We engineered and installed a custom No. 6 runaround turnout to match ...
02/03/2026

This project in Quebec was a big milestone for us.

We engineered and installed a custom No. 6 runaround turnout to match existing curvature and integrate directly through a warehouse to support boxcar unloading and facilitate grain transloading.

The margin for error was slim, and it tested every part of the process — planning, geometry, sequencing, and ex*****on.

That experience helped shape our new logo.

It represents how we approach our work: think it through, build it once, and leave something we’re proud to stand behind.

01/31/2026
Winter brings unique operational challenges to the railroad and, most importantly, to the people who keep it moving.Beyo...
01/30/2026

Winter brings unique operational challenges to the railroad and, most importantly, to the people who keep it moving.

Beyond frigid sub-zero temperatures, snow and ice significantly increase the risk of service disruptions and derailments if not properly managed.

Key areas that require consistent winter maintenance include:

- Crossing flangeways

- Turnout stock rails, switch points and frogs

- Derails

- Rail access gates

Staying ahead of winter maintenance helps prevent service interruptions, costly derailments — and more importantly — protects people and equipment.

Preparation isn’t optional in winter railroading. It’s critical.

Address

72-199 Westwood Rd/
Guelph, ON
N1H7S1

Alerts

Be the first to know and let us send you an email when Petroczi National Rail Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Petroczi National Rail Services:

Shortcuts

Share