Complete façade work (structural double glazing, aluminum, and cladding for all elevations). Complete finishing for the basement and floor areas equipped with exhaust fans, fire alarm, and firefighting systems. For the common areas; super standard finishing for the lobby and front, back and services corridors; complete with the fresh air, exhaust air ducting system, air-condition (HVAC). Administr
ative Area :
○ Electrical distribution panel complete with main and secondary circuits breakers (MDP, EMDP + Generator).
○ Complete wiring system for lighting and power sockets.
○ All walls in the common areas plastered.
○ Fire alarm system.
○ Semi center (DX) system.
○ The building is equipped with an automation system in case of electricity shut down or fire hazard with a backup generator for the Emergency Elec.