Vous avez dit irréparable ?!?
Unsalvageable? Not with CeramAlloy
At a wastewater treatment plant in Southwest Florida, a severely eroded pump suction housing was considered beyond repair — replacement would have cost $10,000 with a 14-week lead time.
Instead, ENECON restored it using CeramAlloy:
Image 1: Severe erosion in suction housing
Image 2: Major wall loss and corrosion damage
Image 3: Rebuilt with CeramAlloy CP+AC and reinforcement mesh
Image 4: Fully encapsulated with CeramAlloy CL+AC for long-term protection
The entire repair was completed in just one day for under $1,000.
ENECON | Repair - Don’t Replace.