24/07/2026
Malago is…Malagone! After 40 years of service, Bristol Port’s cutter suction dredger, Malago, has recently left the Port, marking the end of a chapter in our maritime history.
Built in 1985, Malago played a vital role in maintaining safe access to the Port’s docks, berths and navigational channels by removing silt deposited by the Severn Estuary.
Its articulated swinging cutter head broke up material from the dock bed, which was then pumped through one kilometre of floating pipeline and safely discharged into the estuary.
As Malago reached the end of its operational life with the Port, the decision was made to invest in a replacement. The state-of-the-art dredger, Trym, is efficient and offers greater operational resilience, while enabling the development of a more sustainable marine fleet.
Malago has now been sold and was moved to Swansea. We thank everyone who operated, maintained and worked alongside the vessel during its service.