Severnside Relocatable Systems Ltd

Severnside Relocatable Systems Ltd Need a portable building?

Since 1997, we have supplied, delivered, relocated, bought & removed:

✅New and used portable buildings
✅Shipping containers
✅Toilets
✅Weighbridge offices & Gatehouses

Get in touch to learn more!

Our BIGLOO changing places toilet for hire, set up in our Cinderford Gloucestershire depot for demonstration. BIGLOO is ...
01/09/2026

Our BIGLOO changing places toilet for hire, set up in our Cinderford Gloucestershire depot for demonstration.

BIGLOO is designed to be truly accessible and transportable.

With its:-

• Ceiling hoist.
• Toilet accessible from both sides.
• Ramp and platform when set up on level ground exceeds the requirements of Approved Document M & BS8300.

It is now available for hire!

www.bigloo.co.uk

or contact us on 01594 821008



25/08/2026

Another small hazardous materials cabinet:-

✅Supplied.
✅Delivered.
✅Installed (including positioning and securely bolting to the ground)
✅Defective COSHH cabinet removed and disposed of.

This was all carried out by us with the defective store removed and the new one fully installed by 09:30.

We supply and install small cabinets and vaults. They are built to comply with COSHH regulations and are used for the safe and secure storage of small quantities of hazardous goods.

These cabinets are an ideal solution due to their compact dimensions it means we are able to install them almost anywhere!

Contact us with any requirements you may have.



Another 8’ x 7’ container loaded, secured and ready to go on our Foden Alpha crane lorry.The 8’ x 7’ containers are idea...
18/08/2026

Another 8’ x 7’ container loaded, secured and ready to go on our Foden Alpha crane lorry.

The 8’ x 7’ containers are ideal for compact sites with external dimensions of 2438mm long x 2200mm wide x 2260mm heigh.

Some features are :-

• 5100 KG payload.
• Lock box.
• Double doors.
• Forklift pockets.
• Galvanised door bars.
• Plywood floor.
• Quick delivery.

Simply contact us for any requirements.



Preparation is the most important part of any re paint. It is what takes the time and determines the quality and longevi...
11/08/2026

Preparation is the most important part of any re paint.

It is what takes the time and determines the quality and longevity of the paint finish.

This building is being completely refurbished to a higher standard than when it was built.

When finished it will feature modern upgrades to:-

• Insulation.
• Lighting.
• Heating.
• Windows.
• Flooring.
• Installed in accordance with BS7671 Amendment 3 for the electrical installation.

Meaning it will truly be the green option.



A recently supplied 1+1 mains toilet with sit on tank. The 1+1 is a versatile compact toilet block some features are:-• ...
04/08/2026

A recently supplied 1+1 mains toilet with sit on tank.

The 1+1 is a versatile compact toilet block some features are:-

• Two toilets with independent exterior lockable access doors complete with indicator bolts.
• Electrical installition to BS7671 Amendment 3.
• Including heating, lighting, extractor fans and water heaters.
• UK specification electrical and pluming fittings.
• Insulation to walls and ceiling.
• Compact 8’ x 5’ foot print.
• Hat and coat hooks.
• Mirrors.
• Forklift pockets and lifting eyes for ease of relocation.
• Waste tank option.

Contact us for more information.



Our Foden Alpha crane lorry loading a 20’ container.   We are early morning specialists here at Severnside Relocatable S...
28/07/2026

Our Foden Alpha crane lorry loading a 20’ container.

We are early morning specialists here at Severnside Relocatable Systems with portable buildings and containers delivered or collected before the working day starts!

The advantages of early morning deliveries are:-

• More accurate ETA.
• Less disruption at the delivery point.
• No waiting, the building arrives before your daily routine starts.
•Ready for immediate use.

Contact us with any requirements.



Our full range of accessible toilets can be hired or purchased.From single toilet to full changing places specification....
21/07/2026

Our full range of accessible toilets can be hired or purchased.

From single toilet to full changing places specification.

One that is particularly versatile is our “BIGLOO 2” A 2.7m x 3.6m building with a higher specification than a standard accessible toilets but not the full changing places specification.

This accessible toilets building allows for:-

• Peninsular toilet.
• Full DDA compliant installation.
• Large wheelchair turning circle.
• Baby changing facility.
• Option for a full size changing bench.
• Option for full DDA compliant ramp.

Contact us for more details.



It is Changing Places awareness 2026.Changing places toilets make a huge difference to peoples lives.Accessibility is so...
19/07/2026

It is Changing Places awareness 2026.

Changing places toilets make a huge difference to peoples lives.
Accessibility is so important and our “BIGLOO” Changing Places toilets, for hire with full DDA compliant access ramp delivers this.

Check BIGLOO out at www.BIGLOO.co.uk

Visit www.changing-places.org for more information and the locations of Changing Places Toilets.



Welcome to our new website! Did you know that over a 1/4 million people in the UK need Changing Places Toilets to enable them to get out and about and enjoy the day-to-day activities which many of us take for granted. To use a toilet in safety and comfort, these people need to be able to access a CP...

We were asked to provide a plant room extension to an existing modular building.After viewing images and Google maps we ...
14/07/2026

We were asked to provide a plant room extension to an existing modular building.

After viewing images and Google maps we visited site to confirm the details, specification and location of the proposed new building.

The container was designed and built including:

•Full height pipe work aperture.
•Plywood lining to the walls.
•Insulation.
•Extra ventilation.
•Double doors.

The next challenge was delivery and installation.
•The large crane lorry was set up on our 1 metre diameter crane pads.
•The building was then lifted over the existing building on to foundation pads.
•Tucked under the existing buildings facia.
•The pre made service pipe apertures and floor levels lined up.
•Crane lorry packed away and left site all before lunch time!



As most of us know things do not always go to plan. Luckily there is always another Foden to lend a hand. Thanks Dave Re...
07/07/2026

As most of us know things do not always go to plan.
Luckily there is always another Foden to lend a hand. Thanks Dave Read for such a swift response and repair.

At least the new wheels are still shining!



Address

Severnside Relocatable Systems Ltd, Whimsey Industrial Estate, Steam Mills
Cinderford
GL143JA

Opening Hours

Monday 7:30am - 3pm
Tuesday 7:30am - 3pm
Wednesday 7:30am - 3pm
Thursday 7:30am - 3pm
Friday 7:30am - 3pm

Alerts

Be the first to know and let us send you an email when Severnside Relocatable Systems Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Severnside Relocatable Systems Ltd:

Shortcuts

Share