30/08/2026
Small update from the week just gone:
It's been a tip-top week for us, returning to 44004 Great Gable for the Peak Locomotive Company to carry out an injector change. This took a little longer than anticipated when an injector hold-down stud snapped and required a V-coil. Once this was sorted, we ran it up. It was nice to hear her fire into life, and she sounds amazing. Hats off to the team at Peak Locomotive Company; they truly do put their hearts and souls into maintaining and keeping these old girls running.
The Mirrlees 275:
The big-end blocks have had their final checks and have been fitted (hand tight) to the power unit. We will stress these up Monday. The camshaft is in the process of being polished and having the bearing journals checked. The last of the pipework and also the electrical conduit is being cleaned and prepped for paint.