05/08/2022
Closing the gap between the wooden mezz flooring and the concrete flooring.
Mesh and Racking stripped.
Back board pushed against concrete flooring
Wooden flooring cut to size and placed between the original boards.
Mesh and racking put back together
Scaffolding down and floor hoovered
Now doing the aluminium chequer plates to finish the job off.
Need any storage or flooring works done then get in touch.