Stuart Marshall Rail Engineering Ltd

Stuart Marshall Rail Engineering Ltd SMRE installations

Osijek, CroatiaWorking with edilon)(sedra and Sitolor installing embedded rail system on the tramway in Osijek
22/05/2022

Osijek, Croatia
Working with edilon)(sedra and Sitolor installing embedded rail system on the tramway in Osijek

Re-railing through existing 27m Level crossing
08/11/2020

Re-railing through existing 27m Level crossing

08/11/2020
12/10/2020

The Mid Norfolk Railway has finished work on the refurbishment of the level crossing on Yaxham Road at Dereham.

ADP Harbour, Fredericia - Denmark, edilon)(sedra installation over 2 phases. Total of 92 LCS350 slabs with CEN60 Embedde...
10/10/2020

ADP Harbour, Fredericia - Denmark, edilon)(sedra installation over 2 phases. Total of 92 LCS350 slabs with CEN60 Embedded Rail System installed in collaboration with e)(s.
First job as a team installation with James Buckland, Finn Marshall & Joe Allen. Couldn’t have hoped for a more committed team, Many thanks!!

11 day installation with long hours put in by all, Many thanks to Michiel and Jurriaan for teaching some tricks of the trade and making us feel so welcome.

Some of the pictures that I took whilst working on the project used in this presentation from edilon)(sedra
06/08/2020

Some of the pictures that I took whilst working on the project used in this presentation from edilon)(sedra

We are proud to be part of this amazing bridge project in Africa, close to the Victoria Falls! More to come…...

Finished my contracted works for edilon)(sedra to train the IKUSASA Rail/ KALCON team on the installation of the embedde...
21/07/2020

Finished my contracted works for edilon)(sedra to train the IKUSASA Rail/ KALCON team on the installation of the embedded rail system as part of the Kazungula Bridge project for Daewoo between Botswana and Zambia over the Zambezi River. Amazing team that welcomed me aboard the team. Many thanks also to WBHO for looking after me at the Lusaka end of things. I wish the team all the success completing the rest of the work.

Botswana side of Kazungula Bridge completed the installation of edilon)(sedra Corkelast today, start on Zambia side tomo...
13/07/2020

Botswana side of Kazungula Bridge completed the installation of edilon)(sedra Corkelast today, start on Zambia side tomorrow.

Installation works finally started on the Botswana side after 2 weeks in Quarantine in readiness to work on the Kazungul...
05/07/2020

Installation works finally started on the Botswana side after 2 weeks in Quarantine in readiness to work on the Kazungula Bridge project. Installing the Embedded Rail System for edilon)(sedra.

Address

Whittlesey