Zetica Rail

Zetica Rail Zetica Rail is the world leader in rail GPR and a developer of integrated laser and vision trackbed

Come join us at   stand A06 for more on Zetica    tracked inspection services and systems for condition-based maintenanc...
24/09/2019

Come join us at stand A06 for more on Zetica tracked inspection services and systems for condition-based maintenance planning.

The RASC® Pod MKI deployed and collecting valuable trackbed condition data.
18/07/2019

The RASC® Pod MKI deployed and collecting valuable trackbed condition data.

Jon Gascoyne demonstrating RASC® systems to Hugh Thompson, Program Manager for Track Support and Substructure Research f...
12/07/2019

Jon Gascoyne demonstrating RASC® systems to Hugh Thompson, Program Manager for Track Support and Substructure Research for the Office of Research Development and Technology @ Federal Railroad Administration. Thank you Hugh for visiting Zetica House

The RASC® Pod MKI getting geared up for a hop across the pond and survey on the continent.
10/07/2019

The RASC® Pod MKI getting geared up for a hop across the pond and survey on the continent.

Nice talk by the Zetica Rail CEO this afternoon at   showcasing the synergy of the information we measure that facilitat...
04/07/2019

Nice talk by the Zetica Rail CEO this afternoon at showcasing the synergy of the information we measure that facilitates of track condition defects

Tough gig for our rail team exhibiting at IHHA 2019 in Narvik, Norway. A place where the sun doesn’t set in the summer. ...
11/06/2019

Tough gig for our rail team exhibiting at IHHA 2019 in Narvik, Norway. A place where the sun doesn’t set in the summer.

We’re excited to be exhibiting at IHHA 2019 in Narvik, Norway. One of the themes of the event is ‘Technologies are trans...
04/06/2019

We’re excited to be exhibiting at IHHA 2019 in Narvik, Norway. One of the themes of the event is ‘Technologies are transforming heavy haul maintenance and operations’. See how our in-demand RASC® services could improve your ROI on trackbed maintenance and improve the performance of your maintenance teams.

3 sets of RASC® equipment finally home after an 8 months spell criss-crossing Australasia. Dust it down, service and off...
28/05/2019

3 sets of RASC® equipment finally home after an 8 months spell criss-crossing Australasia.
Dust it down, service and off we go again.
Where will it be this time? 🌏

03/05/2019

Checking the location of some GPR data we collecyef for one of our overseas clients # overseas

Address

Witney
OX294

Alerts

Be the first to know and let us send you an email when Zetica Rail posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share