22/10/2026
It's been a busy couple of weeks for us but I've got a few minutes while I wait for some food to cook.
We're now about 2 weeks from being able to remove the tail from G-LOFB, we're just waiting for a few more railway sleepers and the quick and easy disconnection of two more control cables and one air duct which go through the rear bulkhead.
As part of this we have removed the roof panels from the rear of FB from the port rear door back to the bulkhead, disconnected all but two control cables into the tail section as well as all the wires and ducting, and we have made weight and balance assessments ready for the work.
We have also removed another 3/4kg of screws and as always drilled out more than we've removed from the wing / fuselage fillet panels, these are mostly ready to remove now bar a few stubborn screws which have broken screwdriver tips stuck in them, these will be dealt with using small 1 inch grinding wheels which fit on our drills to grind the head of the screw out along with the washer but without damaging the panels themselves before removing the remaining screw stubs as part of the restoration process later.
No fresh pictures as I'm uploading this from my PC and haven't transferred the photos from the last couple of weekends so I'll upload them soon with more details of the work we've done, so until then please enjoy this drone video made by Duane of LOFB, I'm sure there'll be some more of these before too long too π