15/10/2026
๐ ๐๐๐ถ๐น๐ ๐ณ๐ผ๐ฟ ๐๐ฒ๐ฟ๐๐ฎ๐๐ถ๐น๐ถ๐๐. ๐๐ฒ๐๐ถ๐ด๐ป๐ฒ๐ฑ ๐ณ๐ผ๐ฟ ๐ฝ๐ฟ๐ฒ๐ฐ๐ถ๐๐ถ๐ผ๐ป.
The 08-16 U_RT operates on both single and double sleepers, ensuring flexibility across different track conditions and maintenance scenarios.
Over time, however, wear and system degradation impact accuracy and consistency. Avantgarde restores the machine to its original performance standards through comprehensive overhaul, tamping unit refurbishment, and system upgrades.
Ensuring the machine performs as intended every time.
๐๐ฉ๐๐ก๐ง๐๐๐ฅ๐๐ - ๐๐๐ซ๐๐ฃ๐ ๐๐๐๐ก๐ฌ๐๐ฎ ๐๐๐๐๐๐ฃ๐๐ง๐ฎ ๐ ๐๐๐๐ค๐ฃ๐ ๐๐๐๐
๐Headquarter: SS 96 km 115 โ 70026 Modugno โ Bari (Italy)
๐ฉ [email protected]
๐ avantgarderail.com