WKX 076

WKX 076 A page managed by a train enthusiast.

A junction is where journeys find each other, and where some learn to let go.                                          R...
16/03/2026

A junction is where journeys find each other, and where some learn to let go.






Rapid KL CRRC Rolling Stock Center Malaysia Sdn. Bhd.

Reposting this without any permission and credit to the producer is subjected to copyright.
All Rights Reserved | Kai Xian Wong | 2026

Beyond the layers of expressway, the city never stops moving.                                          Rapid KL    CRRC ...
11/03/2026

Beyond the layers of expressway, the city never stops moving.






Rapid KL CRRC Rolling Stock Center Malaysia Sdn. Bhd.

Reposting this without any permission and credit to the producer is subjected to copyright.
All Rights Reserved | Kai Xian Wong | 2026

Over the straits, other train operator keep finding ways to improve wayfinding and constantly trying new methods. Meanwh...
25/01/2026

Over the straits, other train operator keep finding ways to improve wayfinding and constantly trying new methods.

Meanwhile some operators still prefer to stick with A4 papers on standee that no one can see when there is a huge crowd.

Stesen berikutnya Bandar Utama, stesen pertukaran ke MRT Laluan Kajang. Next station Bandar Utama, interchange station w...
21/12/2025

Stesen berikutnya Bandar Utama, stesen pertukaran ke MRT Laluan Kajang. Next station Bandar Utama, interchange station with MRT Kajang Line.

KVLRT3 LRV trains made by CRRC Zhuzhou are currently undergoing FFR on the mainline and sometimes up to 24 hours non stop in preparation for revenue service very soon.








Reposting this without any permission and credit to the producer is subjected to copyright.
All Rights Reserved | Kai Xian Wong | 2025

Tren ini menghala ke Bandar Utama. The destination of this train is Bandar Utama.KVLRT3 LRV trains made by CRRC Zhuzhou ...
01/12/2025

Tren ini menghala ke Bandar Utama. The destination of this train is Bandar Utama.

KVLRT3 LRV trains made by CRRC Zhuzhou are currently undergoing FFR on the mainline and sometimes up to 24 hours non stop in preparation for revenue service very soon.








Reposting this without any permission and credit to the producer is subjected to copyright.
All Rights Reserved | Kai Xian Wong | 2025

Address

Kuala Lumpur

Alerts

Be the first to know and let us send you an email when WKX 076 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share