Bridgton & Saco River Railroad Museum

Bridgton & Saco River Railroad Museum Formed in 2020, the B&SR RRM aims to bring Bridgton, Maine's narrow gauge railroad back to life!

09/07/2026

Today, September 7th, marks the anniversary of the very last revenue train on the Bridgton Narrow Gauge.

After Engineer Everett Brown brought in the final revenue train hauled by B&H 2-4-4T #7 on September 7th, 1941, Engine #7 would then be tasked to work the scrap trains to tear up the beloved Maine Two-Footer until the only track left was a very small amount in Bridgton and at Bridgton Junction where equipment was stored during World War II before the big move to South Carver, Massachusetts where the remaining rail, locomotives, and cars would be used to create the famous Edaville Railroad which operated for many years.

This footage, taken by railroad enthusiast Dana D. Goodwin in September/October 1941 and is shared with permission of our good friends at the Boston & Maine Railroad Historical Society, show #7 and the scrappers in Bridgton, ME tearing up rail, the aftermath after most of the rail was torn up, and the end of the footage shows the Mayfield Diner, which was made out of old Bridgton & S**o River combine car #25.

A huge thank you to all who attended our seminar on Friday! It was a great turnout and it was good to see how many folks...
09/06/2026

A huge thank you to all who attended our seminar on Friday! It was a great turnout and it was good to see how many folks are interested in the history of the narrow gauge! We additionally got some very exciting new exhibit items in, such as an original Bridgton Telegraph Company insulator from along the old right of way that was donated to us from James Brown.

Additionally we were able to raise $275 towards the March to Bridgton! Since it's launch we have raised $380 towards our first line item, the digitization equipment which has a cost of $1,000.00. We are happy to say that some of that equipment, including some 35mm film scanners, is now on order and we will be able to show off the results here within the next few days!

As we continue to get funds we will order the rest of the equipment we have budgeted out to aid in the digitization of our archives along with items in the Bridgton Historical Society collection. Once we have crossed over the first $1,000 threshold funds will then be split evenly between engineering costs and our upcoming track school.

Want to help contribute to the March to Bridgton? Link to our GoFundme is here: https://gofund.me/d05551dfe . Additionally donations can be mailed to P.O box 682 Bridgton ME 04009 or come visit us at the museum or one of our upcoming fundraisers!

Speaking of our volunteer track school our last announcement is that we have set a tentative start date for it on the weekend of the 25th of October. Tuition cost will be $25 per volunteer and the course will have classroom and field instruction. Classroom instruction will take place at the Methodist Church Museum and practical field instruction will take place at 45 Home Run Rd. If you or anyone you know would be interested reach out to us! Minimum enrollment for the class to proceed is six volunteers.

Thank you everyone for your continued support and we look forward to seeing you at future events!

Sincerely,

The B&SR Railroad Museum Board of Directors

It's about time we talk about a relatively unknown locomotive in the history of the Bridgton & S**o River Railroad, "Bo ...
09/05/2026

It's about time we talk about a relatively unknown locomotive in the history of the Bridgton & S**o River Railroad, "Bo Peep"!

Today, September 5th, marks the anniversary of the 1893 fire that destroyed the Bridgton engine house and heavily damaged B&SR locomotives #1 and #3. B&SR #2 was spared from the fire, having been out on the line at the time of the blaze.

While the cause of the fire was never determined, the B&SR was now short on motive power to run the regular day to day trains over the railroad. With that said, management of the B&SR sent a telegram to another Maine Two-Footer, the Phillips and Rangeley Railroad (part of which would become the Sandy River & Rangeley Lakes Railroad) to inquire about borrowing a locomotive until #1 and #3 were repaired.

The locomotive sent from the P&R RR was their engine #2, the "Izaak Walton". This particular locomotive had been rebuilt prior to the 1890's so it is hard to believe that this engine originally started out life as "Puck", an 0-4-4T built by the Hinkley Locomotive Works in 1877 for George Mansfield's first Two-Foot gauge railroad in the United States, the Billerica and Bedford Railroad.

One issue regarding the lease of this locomotive to the B&SR was the fact that the only in service engine on the B&SR was it's own #2, and the leased engine held the exact same number. To differentiate between the two, crews would only refer to the leased locomotive by name only, be it by its official name Izaak Walton or by its more common nickname by B&SR crews, "Bo Peep".

"Bo Peep" would continue service on the Bridgton & S**o River Railroad for a period of 6 months from September, 1883 to March, 1884 when #1 and #3 would be returned after getting rebuilt. After returning to the Phillips and Rangeley Railroad, the locomotive would become P&R #4 after they acquired a new #2, and the engine would be scrapped in 1912. The locomotive would be the only one in the history of the B&SR/B&H to have a name, as all B&SR owned engines only carried numbers.

Here is a photograph from our collection of the "Izaak Walton" in service on the Phillips & Rangeley Railroad just prior to being leased to the Bridgton & S**o River Railroad.

What does it take to rebuild a narrow gauge railroad?A lot of patience, hard work and a lot of fundraising! It is no sec...
08/24/2026

What does it take to rebuild a narrow gauge railroad?

A lot of patience, hard work and a lot of fundraising! It is no secret that we have been working towards the goal of a rebuilt section of the B&SR for some time now. With recent positive developments we wanted to go over the costs of rebuilding this beloved little line. The answer is that it is a little daunting! In total these are the costs that stand ahead of us:

Engineering: $90,130.00

Grading and Fill: $20,000

Foundation work $20,000

Track Materials: $10,000

Car Shop Construction Cost: $350,000

Phase one construction costs:

$490,130.00

Now that near half of a million dollar price-tag seems very out of reach in some ways but we have over the past few years been able to take a sizeable chunk out of the initial costs! At the project outset in 2020 our projections to purchase the land and develop it was at a cost of somewhere between six and seven hundred thousand dollars for initial infrastructure. To that end we have been able to raise some $127,000 and counting over the last five years. With that we have been able to finance the purchase of property and start on the gargantuan project of engineering a brand new railyard and railbeds along with preserving major B&SR artefacts along the way all while estimates on everything keep going up every year.

With a growing number of locals willing to talk to us about easements, we have finally decided as an organization to launch a modest capital campaign to help further our mission. As voted on by the board today, we are launching The March to Bridgton campaign. Our target before the end of the year is to raise $10,000. Which will be used to do the following:

$8,000 to Sebago Technics for wetland mitigation engineering
$1,000 for the track department for needed hand tools and educational materials and supplies to start up a track volunteer education program.
$1,000 for digitization equipment that would be shared with Bridgton Historical Society to help preserve railroad documents.

The March to Bridgton will be our rolling annual capital appeal to start meaningful progress towards the line itself while we continue operations out of the Methodist church. The campaign will be targeted toward the immediate high priority needs of the organization to fulfill it's mission.

How can you help? Donating directly to the campaign below! Alternatively to our very supporting friends in the rail industry donations or discounts on rail, ties, switch components and other track materials greatly help drive projected costs down! Thanks to friends in the industry such as the Belfast & Moosehead Lake Railroad and Maine Track Maintenance we were able to acquire $36,000 worth of track materials for only $7,600.

Link to the GoFundMe: https://gofund.me/43c61d3c6

We thank all of those who have supported our past campaigns and wish to make the March to Bridgton a smashing success!

Sincerely,

The Bridgton & S**o River Railroad Board of Directors

Good morning everyone!One of the questions we often get asked is what was the purpose of the B&SR and what goods did it ...
08/22/2026

Good morning everyone!

One of the questions we often get asked is what was the purpose of the B&SR and what goods did it carry? Some older documentaries and local folklore would say it was for passenger service primarily and some timber freight which isn't quite an honest reflection or review of the railroads service to the towns along it's 21 mile length nor how the various industrial interests of Bridgton demanded it be built. This idea of the B&SR being just a passenger line is fairly pervasive and we invite you to follow along in this post as we deep dive into some earlier company ledgers of the B&SR.

For a look into the traffic mix of the B&SR we will take a close look at the 1903 ledgers for the company which have the following statistics:

27,000 tons of freight were carried along with 21,600 passengers during the fiscal year.

To further break down the freight tonnage we will sort it into categories and give some tonnage examples:

Fuel oil: In 1901 The Standard Oil Company of New York (SOCONY) built an 11,280 gallon heating and fuel oil tank farm next to the railyard. Howard Burnham would be the local SOCONY agent until the 1930's when he bought the tanks for himself. Rail shipment of oil would begin in 1901 and pick up in 1902 with a single tank car in service, the second tank car would follow in years to come. The B&SR and B&H was the only Maine two-footer to have tank cars in service.

Coal: 9,000 tons brought in annually, 2,200 tons for Pondicherry Mill alone, an additional 1,200 tons were consumed by other local mills, 1,000 tons by the railroad, and the rest went to local homes and businesses for heating.

Produce: During the fall hundreds of tons of apples would leave the Bridgton orchards bound largely for the UK, during the peak of this trade 80% of apples exported along the B&SR were bound for the United Kingdom. Further canned corn and other vegetables from the two canning factories in Bridgton and Harrison made for a busy fall season.

Livestock: The railroad had two dedicated livestock cars by this point in time, both to get animals to fairs across the state but to import new ones into the area. Cattle, horses, mules, chickens, ducks, and geese were moved by the road to various farm and homesteads along the line.

Wool and textiles: eight hundred tons of fresh and shoddy wool were brought in during 1902 to feed the Pondicherry, Forest, and Cumberland (later Gibb's) Mills along with all of the required dyes and machine tooling replacements. Hundreds of tons of raw hides would arrive to the Bridgton tannery, and finished wool and leather bolts and products left as they arrived.

Finished products: Chairs from the mill in Harrison, sawn and finished lumber, baseball bats, and wooden dowels comprised the wooden finished products. While machinery such as industrial planers, bolters for sifting flower, and sawmill blades / linkages, iron plows and castings made by the Ricker Machine Company all left town on the two footer.

That is not to knock the excellent passenger service operated by the railroad for most of it's life. The B&SR prided itself on excellent passenger service and by the dying days of the narrow gauge the B&H fan-trips, where steam power was most common, etched into the memory of those who remember Bridgton's little road. That memory of the camp trains and railfan trips especially by the early authors, observers and preservationists of the two-footers helped propagate the idea that the B&SR was largely a passenger driven road from it's offset. Which considering how much the struggling B&H depended on those passenger revenues, as the Great Depression had thoroughly reduced the once vibrant mill scene in Bridgton to a ghost town, is a reasonable assumption to make.

It however, as seen above does not hold up to scrutiny of the companies early records and the politics surrounding it's foundation. Where local mill interests demanded better and faster connections to markets than the canal and steamboat systems could provide. The added benefit of the railroad, causing a tourism boom in an already popular vacation destination was just an additional benefit of the line, not the principle reason for it's construction.

We hope you enjoyed this deep dive into Bridgton's railroading past

Hello everyone!Quick organizational updates: We are looking forward to a busy weekend at the museum! We have several opp...
08/19/2026

Hello everyone!

Quick organizational updates: We are looking forward to a busy weekend at the museum! We have several opportunities for volunteer training Friday and Sunday, if you are interested in becoming a member or volunteer at the museum please drop by or send a message!

Additionally as a reminder our Semi-annual meeting is this Sunday, August 23rd at 4:15 PM at the Methodist Church Museum in Bridgton. The agenda will be posted under the event post. Major highlights include elections for our open member at large position on the board, budget process for the remainder of the year, discussion of upcoming fundraisers, and the reveal of our late 2026-early 2027 capital funds campaign among other things!

Our members and the general public are encouraged to attend to find out what's going on and the future plans of the museum and organization!

We look forward to seeing you there!

Sincerely,

The B&SR Board of Directors

Museum & Archival Updates:Good afternoon everyone! We are pleased to share some updates from our museum. Since our openi...
07/31/2026

Museum & Archival Updates:

Good afternoon everyone! We are pleased to share some updates from our museum. Since our opening we have gotten some great donated items for our archives and for display!

Included as part of that is a fantastic B&SR stock book donated by Kris Arsenault. This stock book contains an entire series of stock notes and receipts for stocks sold to pay for the Harrison Branch and is a fantastic addition to our early B&SR display cases.

Another good donation was from Jennifer Halm-Perazone, who donated an unused B&SR receipt book which is also in our archives now.

A big thank you to them and all of our other supporters! We will be sharing some larger project updates this weekend.

A reminder that tomorrow evening is our seminar at the Methodist Church about the railroad debates of Bridgton before the construction of the B&SR in 1882. We hope to see you there!

Sincerely,

The B&SR Railroad Museum Board of Directors

Good morning everyone! We are happy to announce expanded hours in conjunction with Bridgton Historical Society ! The mus...
07/10/2026

Good morning everyone!

We are happy to announce expanded hours in conjunction with Bridgton Historical Society ! The museum will be open Thursday to Sunday 10 AM to 4 PM! These hours are in effect immediately and we are open today!

The general admission for the entire building is $8 for adults and children 14 and under are free!

B&SR members enjoy a 50% off admission cost and will only pay $4!

Sincerely,

The B&SR Board of Directors

Good evening everyone!We wish everyone a belated happy 4th of July and have a great many thanks to be giving out for a f...
07/06/2026

Good evening everyone!

We wish everyone a belated happy 4th of July and have a great many thanks to be giving out for a fantastic weekend in B&SR news!

Firstly thank everyone who came out to our open house on July 3rd in conjunction with Bridgton Historical Society . Nearly 100 people attended which was a great turnout for the opening of both museums! A great many questions were asked and answered and we got a lot of positive feedback on how we have displayed the history of Bridgton's two-foot line and a few ways we can improve!

Our normal hours of operation will begin this upcoming weekend July 11th-12th . In conjunction with BHS the combined admission for the whole building is $8 for adults and children under 14 are free.

Secondly a huge thank you is owed to Belfast & Moosehead Lake Railroad for the donation of 67lb rail and another thank you is owed to Todd Bryant's Trucking LLC for shipping the rail down to Bridgton today for us at a very reasonable rate! We took delivery of thirty 30' rails today, which allows for the construction of about 450 feet of track, not including the 67lb rail we have previously taken delivery of. This generous donation has basically given us all of the rail we need for our phase one construction plans in the yard.

We thank everyone for the support that has been given to the project thus far!

Sincerely,

The B&SR Railroad Museum Board of Directors

Address

214 Main Street
Bridgton, ME
04009

Opening Hours

Thursday 10am - 4pm
Friday 10am - 4pm
Saturday 10am - 4pm
Sunday 10am - 4pm

Alerts

Be the first to know and let us send you an email when Bridgton & Saco River Railroad Museum posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Bridgton & Saco River Railroad Museum:

Shortcuts

Share