09/03/2022
This Method is very successful and secure.
P&Z Logistics,Inc completes a 490-lf. pilot tube installation under Highway I-45 in Houston with their Akkerman GBM system. The bore will be finished with 24-in. steel casing for a new waterline.
To learn more about the method, click here:
http://ow.ly/is6U50DcN2J