06/14/2026
Had a few days of digging on this one, stripped Topsoil in the ditchline, installed 260' of culvert, filled 8'×45' ditch to subgrade, boxcut 220'×130' parkinglot anywhere from 2' to 4' in spots, then fabric, dense grade, and topped with stamatt, then dug a 3 sided ditch to control outside water. Big thanks to all the rented trucks that where able to help with hauling, pictures of all rented trucks included.