RCL Services Group

RCL Services Group RCL Services Group, LLC provides railroad signal construction and signal material integration services to the freight and passenger rail industry.

In this unusual year, our Sedalia crew earned recognition for 15 years of Service in their local community, from the Eco...
01/07/2021

In this unusual year, our Sedalia crew earned recognition for 15 years of Service in their local community, from the Economic Development Board. Join us in congratulating them on this milestone achievement.

We decided it wasn’t too early for the Christmas decorations. Yummy breakfast from Busy B’s Bakery, Christmas music, and...
11/25/2020

We decided it wasn’t too early for the Christmas decorations. Yummy breakfast from Busy B’s Bakery, Christmas music, and it was done in record time.

The Benbrook Office hosted                                 “The Great Pumpkin”                                    Decora...
10/30/2020

The Benbrook Office hosted
“The Great Pumpkin”
Decorating Contest
Here are some pics….Brad's spider won Best in Show, but Marge from HR was a very close second!

Ugly Sweater Day in Fort Worth. Regina won first place with her opinionated sweater, closely followed by Ford in his blu...
12/17/2019

Ugly Sweater Day in Fort Worth. Regina won first place with her opinionated sweater, closely followed by Ford in his blue sweater with bowtie. Great food was eaten all day long!

Team Spirit Day in Fort Worth
09/20/2019

Team Spirit Day in Fort Worth

05/19/2017
A recent report from the Towson University Regional Economic Studies Institute found that every single railroad job supp...
08/05/2016

A recent report from the Towson University Regional Economic Studies Institute found that every single railroad job supports nine additional in other industries. As a company that deals directly with railroads, we are a prime example of the connection between a healthy freight rail industry that is able to invest at a high level and the success of our employees. Read more on the study at: https://www.aar.org/Report-2/

Check out the latest report from the Association of American Railroads showing how railroad spending and investment in e...
06/15/2016

Check out the latest report from the Association of American Railroads showing how railroad spending and investment in equipment, infrastructure and technology not only makes our industry stronger, but also drives growth across the economy.

RCL WIRING, LP's QUALITY ASSURANCE PROGRAM CERTIFIED BY AARRCL Wiring, LP has been honored with a QA Certification by th...
04/15/2016

RCL WIRING, LP's QUALITY ASSURANCE PROGRAM CERTIFIED BY AAR

RCL Wiring, LP has been honored with a QA Certification by the Association of American Railroads (“AAR”) by having met the AAR’s requirements for having a Quality Assurance Program in accordance with M-1003. According to the AAR, RCL Wiring, LP’s Quality Assurance Program demonstrates compliance to the AAR’s Specification for Quality Assurance. RCL Wiring, LP has been found by the AAR to adequately document the requirements of M-1003 and apply them within its facility in Sedalia, MO.

COMPLEXITIES OF PTC FROM A RAIL SUPPLIERThe National Transportation Safety Board recently identified rail safety, and th...
02/01/2016

COMPLEXITIES OF PTC FROM A RAIL SUPPLIER

The National Transportation Safety Board recently identified rail safety, and the complex safety system known as positive train control, or PTC, as top national priorities. In this context, it is important that the public and media understand that railroads and the companies that supply materials and technology to railroads work doggedly every day to ensure trains operate safely.

By Mike Cook, President, RCL Services Group

Taking over 500 components for multiple railroads, wiring them together according to each railroad’s specification, ensuring they work correctly and then sending the final product to a railroad site — for connecting to tracks, underground cables, signal structures, and communications towers — is complex and challenging work. It is the work we do at RCL Wiring and it is critically important to the safe implementation of PTC technology.

The nation’s freight railroads recently filed their plans for implementing PTC, as required by Congress. Installing this highly advanced technology, which is designed to automatically stop a train before certain types of accidents occur, is a huge undertaking because it must be put on some 60,000 miles of tracks shared with passenger trains and tracks that carry certain hazardous materials.

RCL has wired train control and safety systems for railroads for years, but the 2008 requirement that railroads install PTC changed the game.

While previously our focus was assembling the technology that operates railroad signals — lights, crossing gates, switches, and the like — PTC adds a new layer of advanced technology to our work.

With the addition of new PTC processors, our products control not only railroads signals, but they also handle the stream of inputs and outputs that are constantly communicated between moving locomotives and back-office servers at dispatch offices. This ensures that railroads know the exact position of a train, its speed and the status of the rail network — and can remotely control that train to avoid an accident.

This is exciting, highly advanced and complex technology designed to make an already-safe rail network even safer.

The rush to install PTC on freight and passenger tracks has put a big demand on manpower, training and equipment — both the components required to assemble the technology and the equipment required to distribute it. While the entire railroad industry is part of a major effort to install this technology, it is most important that we do it right.

At RCL, we test every component that comes into our shop to make sure it works as intended prior to assembly. We then test the assembled system to make sure it has been put together correctly before testing a final time to ensure it works according to its design. In our lab setting, we are able to connect our products to actual railroad signals and equipment that simulate controls coming in and going out.

But even after we’re satisfied here in Sedalia, our products are integrated into real-world systems with moving locomotives, existing signals, various communications and radio systems and varying PTC servers at railroads across the country. Given the critical role of railroads to our economy and the importance and complexity of PTC technology, taking the time to test and get it right has enormous consequences.

Freight railroads have a long history of network investments — some $600 billion since 1980 — that lead to innovation and safety advances, as discussed in a Special Report issued by the Association of American Railroads this week. Investments by freight railroads help us employ about 100 people at our facility in Sedalia and we are proud of the role RCL plays in bringing technologies like PTC to life.

Address

7501 Benbrook Pkwy
Fort Worth, TX
76126

Alerts

Be the first to know and let us send you an email when RCL Services Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share