10/14/2026
Being shortlisted for Excellence in Engineering in the Heavy Lift Awards means having a team that works with precision 🔬
When the Vistula River hit historic low water levels, our team moved 465-ton LPG storage tanks by barge from Gdynia to the Orlen refinery in Płock. We custom-engineered a 100-tank buoyancy system, rolled the tanks on their sides to clear low bridges, and used divers to quickly remove the buoyancy tanks before the river locks. The result was a safe, successful delivery and a clear demonstration of engineering under pressure.
Check out the full report here 👉 https://bit.ly/4dDXeMA