05/15/2026
In the last 2 weeks I have hauled approximately 90 loads of dirt from one end of the work site to the other end. 19 loads of 2” minus from the gravel pit for the shared road and new driveway. This does not include another 20 loads hauled by J.W. Hauling’s belly dump trailer. Also hauled brush and a few logs!