06/27/2019
June 27th entrance road is inaccessible. At level 26' small amount of water on entrance road-(check Alton graph)No observed vessel or dock problems.
Within the past 3 months HPYC has been inundated with water, at various levels. Recently the highest level has damaged much of the grounds, lifthouse and pool. HPYC board will have more knowledge of damage and a detailed plan to recover from the severe flooding. During the past several months the harbor was routinely checked and inspected to assure the dock and vessels were safe and not damaged.
It is important that the members rally around the clean-up efforts and offer any expertise in fix up efforts. During the cleanup efforts, we will continue to post the status of the harbor.
Thank you for your patience, and remember the importance of paid timely assessments during this recovery period