10/09/2026
The ole zing pow Hydrasport has been through a lot this summer but she’s finally taking shape and looking like a boat again! Every part for this boat has been custom built and she is full composite we’ve taken every bit of wood out we could find even under the washboards. New coosa stern coosa stringers new fuel tank new water tanks head inside the console lean post seat built with storage on the front and bait rigging station on the back as well as tackle locker underneath fish box on the stern will have 2 shallow live wells one on each side in the corners with access underneath for all the rigging from the console to motors the coffin box has a small cooler we built to the front of it to keep things seperate and easy to grab and the list goes on but it’ll be a cool rig when it’s finished!